Commercial Electrical — Ironclad Electrical

Commercial electrical is more than running cable and fitting power points. Done correctly, it requires a thorough understanding of AS/NZS 3000 Wiring Rules, compliance with the National Construction Code (NCC), coordination with other trades, and practical knowledge of how tenants actually use their space. Ironclad Electrical has delivered commercial electrical works across retail, hospitality, healthcare, aged care, education, warehousing and office environments since 2004. We wire for how the building will actually operate, not just how it looks on a plan.

Fitout and Base Build Works

Commercial electrical projects typically fall into two categories: base build and tenancy fitout. Base build covers the electrical infrastructure installed during construction, including main switchboards, sub-distribution boards, metering arrangements, essential services infrastructure, and the cable tray and conduit reticulation that tenants will eventually tap into. Tenancy fitout work involves the final distribution within a leased space, including lighting, power, data, HVAC connections and any specialised equipment connections. Ironclad Electrical is experienced in both streams and understands where the base build contractor obligations end and the fitout contractor obligations begin. We review electrical services drawings, coordinate RFIs with the superintendent, and ensure the scope is documented clearly before works commence.

Lighting, Power and Data Infrastructure

Modern commercial fitouts demand integrated solutions across lighting, general purpose outlets (GPOs), three-phase connections for commercial kitchen and HVAC equipment, data infrastructure, and emergency lighting systems. Ironclad Electrical designs and installs LED lighting systems with daylight sensors and DALI dimming controls where energy efficiency targets apply, installs structured cabling to AS/ACIF S008 standards where required by the client or building management, and ensures emergency lighting and exit signs comply with AS/NZS 2293.1. All residual current device (RCD) and circuit breaker protection is coordinated to ensure correct discrimination and compliance with the mandatory RCD requirements under AS/NZS 3000 clause 2.6.

  • Main switchboard and sub-board design, supply and installation
  • LED lighting design and installation with DALI or 0-10V dimming controls
  • GPO and three-phase outlet reticulation to NCC and AS/NZS 3000 requirements
  • Emergency lighting and exit sign installation and commissioning to AS/NZS 2293.1
  • RCD and circuit protection coordination to AS/NZS 3000 clause 2.6
  • Metering and sub-metering installation for NCC energy compliance reporting

Project Management and Trade Coordination

On commercial projects, the electrical contractor sets the pace for mechanical, fire and data trades because the conduit and cable tray routes must be resolved before walls are closed. Ironclad Electrical attends site meetings, participates in trade coordination sessions, and maintains current lookahead programmes so our works never hold up the critical path. We employ a dedicated project coordinator for any project above $150,000 in scope, who manages submittals, RFIs, variations and programme updates on behalf of the site team. Our site supervisors hold a current White Card, site-specific inductions and any specialised access qualifications required by the site.

Handover, Testing and Certification

Commercial electrical works require formal test and inspection records, a Certificate of Test or Compliance issued under the relevant state electrical safety act, and as-built documentation accurate enough for the building facilities manager to use for the life of the asset. Ironclad delivers a full handover pack including circuit schedules, board directories, insulation resistance test results, RCD trip-time test records and a commissioning report for any controlled lighting or metering system. We schedule the final building authority inspection and attend to address any hold points. Contact us at build@ironcladelectrical.com.au with your programme dates and we will confirm our availability immediately.

// FAQ

Straight
answers.

Can Ironclad Electrical handle both the base build and the tenancy fitout in a single contract?
Yes. We prefer to carry both scopes where the programme permits because it eliminates interface disputes and simplifies the documentation trail. We price each scope separately within the same contract so the builder and tenant have clear cost visibility, and we manage programme handover between the two scopes internally.
What documentation do you provide at project completion?
Every commercial project receives a full handover pack containing as-built electrical drawings, circuit schedules and board directories, insulation resistance and continuity test results, RCD trip-time test records, a Certificate of Test or Compliance issued under state legislation, and commissioning reports for any BMS, DALI or metering systems. We can provide O&M manuals for major plant items on request.
Do you carry out staged works to keep the tenancy operational during upgrades?
Absolutely. For occupied tenancies undergoing upgrades we develop a staging plan that keeps live circuits operational while works proceed in adjacent areas. Temporary distribution arrangements, partial isolations with agreed switching windows, and out-of-hours work scheduling are all standard tools we use to protect your business continuity throughout the project.